Before: e2e \`needs: [frontend]\` waited for the frontend job to upload a build artifact, then downloaded it. With multiple runners this means the third runner sat idle for ~6 min while frontend ran, then started e2e — total wall-clock max(backend, frontend+e2e) ≈ 11 min. After: e2e builds its own frontend (npm ci + npm run build are already in the job; just dropped the artifact download step and added the build). e2e starts immediately on a free runner. Adds ~1-2 min to the e2e job duration but removes ~5 min of waiting and eliminates the cross-job artifact mechanism entirely. Side benefit: no more \`actions/upload-artifact\` v3/v4 GHES headaches on the cross-job handoff. The \`if: always()\` upload of the playwright-report at the end of e2e is kept (failure report retrieval is still useful), but it's a leaf-output, not a dependency. Net wall-clock: max(backend=9m, frontend=6m, e2e=7m) ≈ 9 min on the 3-runner setup, down from ~11 min. Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>