- FastAPI backend with JWT auth - PostgreSQL database schema - Trees and Sessions CRUD APIs - Export functionality (Markdown, Text, HTML) - Docker setup for local development - Alembic migrations
95 lines
3.6 KiB
Markdown
95 lines
3.6 KiB
Markdown
# Troubleshooting Decision Tree Application
|
|
## Project Overview
|
|
|
|
### Vision
|
|
A decision tree troubleshooting application designed for MSP engineers to transform diagnostic processes into clean, professional documentation automatically.
|
|
|
|
### Core Problem
|
|
MSP engineers like Michael face constant context switching between diverse technical issues (file shares, server outages, VPN failures, Active Directory problems). Each context switch:
|
|
- Takes 15-25 minutes to regain full focus
|
|
- Creates cognitive overhead and attention residue
|
|
- Contributes to burnout (research-backed)
|
|
- Makes consistent documentation challenging
|
|
- Results in lost tribal knowledge
|
|
|
|
### Solution
|
|
An intelligent decision tree system that:
|
|
- Guides engineers through proven troubleshooting paths
|
|
- Captures decisions and notes automatically
|
|
- Generates professional ticket documentation
|
|
- Builds institutional knowledge
|
|
- Reduces cognitive load during high-stress situations
|
|
|
|
### Success Criteria
|
|
**3-Month Goal:** Michael uses this tool for 50% of his tickets
|
|
|
|
**Key Metrics:**
|
|
- Time saved per ticket
|
|
- Documentation quality improvement
|
|
- Reduction in "what did I do?" moments
|
|
- Team adoption rate
|
|
- Reduction in repeated troubleshooting attempts
|
|
|
|
### Target Users
|
|
**Primary:** Senior Systems Engineers at MSPs managing Windows Server, Active Directory, Citrix, networking equipment
|
|
|
|
**Secondary:**
|
|
- Junior engineers needing guided troubleshooting
|
|
- Onsite technicians following remote engineer instructions
|
|
- MSP teams wanting standardized procedures
|
|
|
|
### Key Differentiators
|
|
1. **Automatic documentation generation** - No separate note-taking step
|
|
2. **On-the-fly customization** - Add custom branches when encountering edge cases
|
|
3. **Learning system** - Tracks common paths, suggests optimizations
|
|
4. **Automation integration** - Execute PowerShell/scripts directly from decision nodes
|
|
5. **Knowledge hub** - Links to documentation, KB articles, tutorials at each step
|
|
6. **Team collaboration** - Controlled authorship with shared access
|
|
|
|
### Potential Market
|
|
- 30,000+ MSPs in North America alone
|
|
- Average MSP has 15-50 technical staff
|
|
- Adjacent markets: Internal IT teams, DevOps, Technical Support
|
|
|
|
### Monetization Possibilities
|
|
- **Free Tier:** Personal use, limited trees
|
|
- **Pro Tier:** Team sharing, unlimited trees, analytics
|
|
- **Enterprise:** API access, SSO, custom branding, white-label
|
|
- **Marketplace:** Community-contributed trees (revenue share)
|
|
- **Consulting:** Custom tree development services
|
|
- **Integrations:** Paid add-ons for ConnectWise, Kaseya, etc.
|
|
|
|
### Name Ideas (To Workshop)
|
|
- TroubleTree
|
|
- DecisionPath
|
|
- MSP Navigator
|
|
- FlowDoc
|
|
- DiagnosticFlow
|
|
- PathFinder
|
|
- TechTree
|
|
- TicketFlow
|
|
- DiagPath
|
|
|
|
### Competitive Landscape
|
|
**Current Solutions:**
|
|
- Static runbooks/wiki pages (not interactive)
|
|
- Flowchart tools (not designed for real-time troubleshooting)
|
|
- Ticketing system templates (limited branching logic)
|
|
- Decision tree software (too generic, not MSP-focused)
|
|
|
|
**Our Advantage:**
|
|
Purpose-built for technical troubleshooting with automation integration and automatic documentation generation.
|
|
|
|
### Technology Philosophy
|
|
- **Web-first:** Accessible anywhere, no installation
|
|
- **Progressive enhancement:** Works offline, syncs when online
|
|
- **API-driven:** Backend separate from frontend for flexibility
|
|
- **Extensible:** Plugin architecture for integrations
|
|
- **Open-source friendly:** Consider open-sourcing core, monetize integrations/hosting
|
|
|
|
### Project Status
|
|
**Current Phase:** Planning and Architecture
|
|
**Next Phase:** MVP Development (Weeks 1-3)
|
|
**Target MVP Date:** 3 weeks from project start
|
|
**Target Production Date:** 6-8 weeks from project start
|