# HANDOFF.md **Last updated:** 2026-04-25 16:41 EDT **Active task:** Land PR #150 (the consolidated CI-recovery PR), then enable backend and eventually e2e gates on `main`. See [CURRENT_TASK.md](CURRENT_TASK.md). **Branch:** `fix/ci-workflow-config` -> PR #150. PRs #151 and #152 were closed and consolidated into this branch. ## Current resume point Latest PR #150 CI had backend and frontend green, but `CI / e2e (pull_request)` failed on the resume smoke test. The failure was not product behavior. Playwright was using: ```ts page.locator('.bg-card').filter({ hasText: tree.name }).first() ``` On the session history page this matched the tree filter `